Commissioning

Commissioning is the last stage previous to the system normal operation at the destiny place:

  • Equipment configuration: single equipment configuration when it is needed to integrate them into the global system under application conditions.
  • Programming settings: function, PID or other settings at destiny operation place.
  • Site Acceptance Test (SAT): acceptance testing at operation place in order to accept & validate the global system operation.